University of Western Australia |
University of Western Australia |
Education |
|
|
Facilitation & reporting of HAZID on mine operations |
|
Hatch |
Hatch/AHEA |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Set voluntary reductions in greenhouse gas emissions |
| Dec-04 |
Australian Greenhouse Office |
Department of the Environment and Heritage |
Technical Services |
Energy |
Energy Audit |
Facilitation & reporting of technical risk assessment on boiler safety development |
| Jul-05 |
MYR Consulting |
WAPL |
Metal Product Manufacturing |
Risk |
Capital Cost Estimate |
Worsley Upgrade Project Cost Estimate |
| Apr-08 |
WorleyParsons |
APA |
Oil and Gas Extraction |
Risk |
SIL Review |
Windimurra Gas Station SIL Review |
| Jul-08 |
WorleyParsons |
APA Pipeline Trust |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Windimurra Gas Station Construction & Commissioning HAZID |
| Aug-06 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Design Review |
WII Trunkline - Constructablity Review |
| Jan-09 |
Coffey |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey HAZIDs |
| Feb-09 |
URS |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey HAZID - Sediment Survey |
| Feb-09 |
URS |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey HAZID - ROV |
| Feb-09 |
URS |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey HAZID - Met Station |
| Feb-09 |
URS |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey HAZID - Helicopter |
| Aug-09 |
Coffey |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey - Shallow Bores - HAZID |
| Sep-09 |
Coffey |
Chevron |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Wheatstone Project Site Survey - Durabase Matting HAZID |
| Jun-09 |
WorleyParsons |
API |
Metal Ore Mining |
Risk |
Project Risk Management |
West Pilbara Iron Ore |
| Feb-10 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
WEL Nganhurra Gas Lift Riser Reinstatement HAZOP |
| Sep-09 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
WEL Nganhurra Gas Lift Riser HAZOP |
| May-08 |
WorleyParsons |
WorleyParsons |
Water Supply, Sewerage and Drainage Services |
Risk |
Project Risk Assessment |
Watercorp Desalination Plant Project Risk Assessment |
| May-09 |
Edith Cowan University |
Edith Cowan University |
Education |
Environment |
Policy Guidance |
Water EMP |
| Mar-08 |
Edith Cowan University |
Edith Cowan University |
Education |
Environment |
Policy Guidance |
Water EMP |
| Nov-09 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
WAPL Flash Vessel PZHH Interlock HAZOP |
| Sep-09 |
WorleyParsons |
BHPB Worsley Consultancy |
|
Risk |
HAZOP |
WAPL Efficiency & Growth Project |
| Nov-09 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
WAPL Digester PRV Interlocking HAZOP |
| Sep-08 |
AEE |
Worsley |
Electricity and Gas Supply |
Risk |
HAZOP |
WAPL Cogeneration Plant HAZOP |
| Mar-09 |
AEE |
Worsley |
Electricity and Gas Supply |
Risk |
HAZOP |
WAPL Cogeneration Plant Final HAZOP |
| Mar-09 |
AEE |
Worsley |
Electricity and Gas Supply |
Risk |
CHAZOP |
WAPL Cogeneration Plant CHAZOP |
| Oct-09 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
Functional Safety |
WAPL Calciner Functional Safety Audit |
|
WorleyParsons |
Worsley |
|
Risk |
HAZOP |
WAPL Boiler 2 Chem Clean HAZOP |
| Jul-09 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
Quantitative Risk Analysis |
WAPL Area 3 Flushing Liq Overpressn QRA |
| Jul-04 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Wagerup Refinery Boiler 2 Safety Life Cycle |
| Aug-04 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Wagerup Calciner 2 |
| Sep-05 |
MYR Consulting |
WACA |
Sport and Recreation |
Risk |
Insurance Risk Survey |
WACA Risk Assessment |
| Oct-05 |
WA Electoral Commision |
WA Electoral Commision |
Government Administration |
Energy |
Energy Audit |
Wa Electoral Commision Office Energy Audit |
| Nov-09 |
WorleyParsons |
Verve Energy |
Electricity and Gas Supply |
Risk |
HAZOP |
Verve KPS Mill Desander HAZOP Nov 09 |
| Oct-09 |
WorleyParsons |
Verve Energy |
Electricity and Gas Supply |
Risk |
HAZOP |
Verve KPS Mill Desander HAZOP |
| Sep-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Ultrafiltration Pilot Plant |
| Jun-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Ultrafiltration Pilot Plant |
|
WorleyParsons |
Woodside |
|
Risk |
HAZOP |
TWW Woodside Trunkline Split HAZOP |
|
WorleyParsons |
|
|
Risk |
HAZOP |
TWW PSP01 HAZOP |
| Jun-10 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
TWW NR2 Sand Monitoring Instrumentation HAZOP |
| Jun-10 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
TWW GWA Air Compressor Replacement HAZOP |
| Jan-07 |
WorleyParsons |
BHP Billiton |
Metal Ore Mining |
Risk |
HAZOP |
Turbo-alternator #1 electrical protection upgrade |
| Jul-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
AS2885 Risk Assessment |
Trunkline AS2885 Review and update |
| Sep-07 |
WorleyParsons |
Worsley |
|
Risk |
HAZOP |
Train 1 & 2 Precip Caust Clean HAZOP Sep 07 |
|
WorleyParsons |
Worsley |
|
Risk |
HAZOP |
Train 1 & 2 Precip Caust Clean HAZOP |
| Nov-08 |
Department of Resources Energy and Tourism |
Department of Resources Energy and Tourism |
Metal Ore Mining |
Energy |
Technical Report |
Theiss Mining EEO verification |
| Feb-05 |
MYR Consulting |
Siam Cement |
Non-Metallic Mineral Product Manufacturing |
Risk |
Training |
Thailand Risk Management Visit |
| Oct-05 |
MYR Consulting |
Jardine Lloyd Thompson |
Wood & Paper Product Manufacturing |
Risk |
Insurance Risk Survey |
Thailand AA/Banpu Visit |
| Jun-08 |
Department of Resources Energy and Tourism |
Department of Resources Energy and Tourism |
Technical Services |
Energy |
Technical Report |
Technical Advisor EEO |
| Aug-07 |
GRD Minproc |
Freeport McMoran |
Metal Ore Mining |
Risk |
Quantitative Risk Analysis |
SX Plant Fire Detection & Protection |
|
University of Western Australia |
University of Western Australia |
Education |
Energy |
|
Sustainability Strategy |
| Sep-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
Stabiliser 6 Project |
| Jun-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
Stabiliser 6 Project |
| Jul-05 |
City of Cockburn |
City of Cockburn |
Sport and Recreation |
Energy |
Energy Audit |
South Lake Leisure Centre Energy Audit |
| Mar-07 |
St Ives |
St Ives |
Metal Ore Mining |
Energy |
Energy Audit |
Site Energy Audit |
| Jan-06 |
MYR Consulting |
Jardine Lloyd Thompson |
Non-Metallic Mineral Product Manufacturing |
Risk |
Insurance Risk Survey |
Siam Cement Thailand Visit (5 plants) |
| Nov-04 |
ElecDes Utilisation |
GHD Pty Ltd |
Water Supply, Sewerage and Drainage Services |
Environment |
Technical Report |
Scoping Review and Report |
| Mar-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
CHAZOP |
Sand Surge Tank Level Control |
| Oct-95 |
GHD |
WA Water Corporation |
Water Supply, Sewerage and Drainage Services |
Energy |
Technical Report |
Samson Brook Pumping Station Power and Controls Design |
| Aug-08 |
WorleyParsons |
Hancock Prospecting |
Metal Ore Mining |
Risk |
Project Risk Assessment |
Roy Hill Project Risk Assessment |
| Aug-08 |
WorleyParsons |
Hancock Prospecting |
Metal Ore Mining |
Risk |
Project Risk Assessment |
Roy Hill Project Risk Assessment |
| Feb-10 |
AMEC Minproc (previously GRD Minproc) |
Extract Resources |
Metal Ore Mining |
Energy |
Energy Options |
Rossing South - Renewable Energy Feasibility Study |
| Jul-08 |
GRD Minproc |
BHP Billiton |
Metal Ore Mining |
Risk |
HAZOP |
RNO c-RIP Demonstration Project HAZOP |
| Nov-07 |
Heron Resources |
Heron Resources |
Metal Ore Mining |
Risk |
Project Risk Assessment |
Risk Assessment in Pre-Feasibility Study |
| Sep-07 |
QMAG |
QMAG |
Metal Ore Mining |
Risk |
Process Safety Management |
Review of Process Safety Management Systems |
| May-06 |
Office of Energy WA |
Office of Energy WA |
Technical Services |
Energy |
Energy Options |
Provision of Services Associated with the Identification & Assessment of the Potential for use of Small Scale Generation Technology in WA |
| Feb-07 |
Department of Environment and Heritage |
Department of Environment and Heritage |
Technical Services |
Energy |
Technical Report |
Provision of Annual Progress Report on WA Government Greenhouse Strategy |
| Nov-07 |
WorleyParsons |
Midwest |
Metal Ore Mining |
Risk |
Project Risk Assessment |
Project Risk Assessment during PFS |
| Dec-05 |
GRD Minproc |
First Quantum |
Metal Ore Mining |
Risk |
HAZOP |
Process Plant Expansion |
| Jun-06 |
GRD Minproc |
Phelps Dodge |
Metal Ore Mining |
Risk |
HAZID |
Process Plant - Preliminary Hazard Study |
| Dec-05 |
GRD Minproc |
Phelps Dodge |
Metal Ore Mining |
Risk |
HAZID |
Process Plant - Preliminary Hazard Study |
| Oct-07 |
AIG |
Rio Tinto |
Technical Services |
Risk |
Business Continuity Planning |
Prep'n of a template for Business Continuity Plans |
| Jul-07 |
WorleyParsons |
Moly Mines |
Metal Ore Mining |
Risk |
Hazardous Area Determination |
Preliminary Hazardous Area Determination |
| May-06 |
Battery Limits |
Oxiana |
Metal Ore Mining |
Risk |
HAZID |
Preliminary Design HAZID of Process Plant |
| May-05 |
University of Western Australia |
University of Western Australia |
Education |
Energy |
Technical Report |
Pool Blanket Energy Saving Review |
| Jul-08 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Project Risk Assessment |
Pluto Project Project Risk Assessment |
| Nov-09 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
Pluto Effluent Tank Contingency Plan HAZOP |
| Mar-08 |
GRD Minproc |
ERA |
Metal Ore Mining |
Risk |
HAZID/Process Plant |
Plant Expansion Study |
| Oct-07 |
Alcoa |
Alcoa |
Metal Product Manufacturing |
Energy |
Energy Audit |
PJEU upgrade greenhouse gas emmisions management plan |
|
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Pinjarra Efficiency Safety Life Cycle |
| Aug-05 |
Total Automation |
Pilbara Iron |
Metal Ore Mining |
Risk |
Equipment Review |
Pilbara Iron EII Stacker Electrical Compliance Review |
| May-06 |
WorleyParsons |
Alinta |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Operations HAZID & Qual Risk Assessment |
| Jul-10 |
PIE (Plant & Infrastructure Engineering) |
Onslow Salt |
Other Non-metallic Minerals |
Risk |
HAZID/OHS Risk Assmt |
Onslow Salt Washplant HAZID |
| Sep-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Onshore Construction HAZIDs |
| Feb-09 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
NR2 Project Re-HAZOP of Various Systems |
| Apr-08 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
NR2 Project Re-HAZOP of Various Systems |
| Oct-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
NR2 Project Re-HAZOP of Portions |
| Feb-08 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
NR2 Project Re-HAZOP of Firewater System |
| Apr-08 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
CHAZOP |
NR2 Project Prelim Functional CHAZOP |
| Apr-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
NR2 Project HAZOP of NRB |
| Apr-09 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Technical Risk Assessment |
NR2 Project ALARP Workshops |
| Nov-06 |
St John of God Healthcare Australia |
St John of God Healthcare Australia |
Hospitals and Nursing Homes |
Environment |
Policy Guidance |
National Environmental Study |
| Oct-08 |
WorleyParsons |
APA Pipeline Trust |
Oil and Gas Extraction |
Risk |
HAZOP |
Murrin Metering Station HAZOP |
| Nov-06 |
WorleyParsons |
Alinta |
Oil and Gas Extraction |
Risk |
HAZOP |
Murrin Lateral Modification |
| Jul-06 |
WorleyParsons |
Agility |
Oil and Gas Extraction |
Risk |
HAZOP |
Mondarra Development - Stage 2 |
| Jul-06 |
WorleyParsons |
Agility |
Oil and Gas Extraction |
Risk |
HAZOP |
Mondarra Development - Stage 1 |
| Jan-08 |
MYR Consulting |
Takraf |
Coal Mining |
Risk |
Technical Risk Assessment |
Mobile Machinery Electrical Risk Review |
| Apr-07 |
WorleyParsons |
Moly Mines |
Metal Ore Mining |
Risk |
HAZOP |
Mineral Processing Plant HAZOP |
| Aug-06 |
WorleyParsons |
FMG |
Metal Ore Mining |
Risk |
HAZID/OHS Risk Assmt |
Mine Stockpile & Train Loadout |
| Apr-08 |
GRD Minproc |
Mina Justa |
Metal Ore Mining |
Risk |
HAZID/OHS Risk Assmt |
Mina Justa HAZID |
| Aug-06 |
WorleyParsons |
Barrick |
Metal Ore Mining |
Risk |
HAZID |
Mill Upgrade HAZID |
| Nov-08 |
QMAG |
QMAG |
Metal Ore Mining |
Risk |
SIL Review |
MHF3 SIL Review |
| Mar-10 |
QMAG |
QMAG |
Metal Ore Mining |
Risk |
Technical Report |
MHF3 Commissioning Planning |
| Apr-05 |
MYR Consulting |
Byrnecut |
Metal Ore Mining |
Risk |
Equipment Review |
MDG 15 Underground Mobile Equipment |
| Oct-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Marine Dredging HAZIDs |
| Aug-05 |
Pilbara Iron |
Pilbara Iron |
Metal Ore Mining |
Risk |
HAZOP |
Marandoo HAZOP & Risk Assessment |
| Aug-08 |
WorleyParsons |
Maaden Port Development |
Electricity and Gas Supply |
Risk |
HAZOP |
Maaden Power Generation Electrochlorination HAZOP |
|
Curtin University |
Curtin University |
Technical Services |
Energy |
Research |
Low Grade Heat Recovery Literature Search |
| Mar-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
CHAZOP |
Load Shedding Modifications |
| Oct-06 |
WorleyParsons |
Wesfarmers LPG |
Oil and Gas Extraction |
Risk |
HAZOP |
LNG Plant Tie Ins |
| Mar-09 |
GRD Minproc |
W2R Lancashire Waste |
Community Services |
Risk |
HAZOP |
Lancashire W2R Plant HAZOP |
| Sep-08 |
GRD Minproc |
W2R Lancashire Waste |
Community Services |
Risk |
HAZOP |
Lancashire W2R Plant HAZOP |
| Mar-07 |
WorleyParsons |
Sunset Coast |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
Kwinana WWTP Detailed Design |
| Sep-08 |
WorleyParsons |
NewGen Power |
Electricity and Gas Supply |
Risk |
Technical Risk Assessment |
Kwinana NewGen Power Station Fire Risk Assessment |
|
WorleyParsons |
|
Electricity and Gas Supply |
Risk |
HAZOP |
Kwinana H2 HAZOP |
| Apr-07 |
WorleyParsons |
Watercorp |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
Kwinana Desalination Plant Air Entrainment |
|
WorleyParsons |
|
Electricity and Gas Supply |
Risk |
HAZOP |
Kwinana Coal Mills HAZOP |
| Mar-07 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Project Risk Management |
KW Residue Drying Area "N" Project |
|
WorleyParsons |
|
|
Risk |
HAZOP |
KPS K6 Boiler Chem Clean |
| Jul-09 |
WorleyParsons |
Karara Mining Limited |
Metal Ore Mining |
Risk |
HAZOP |
Karara Iron Ore Project Partial |
| Nov-04 |
Newmont Australia |
Newmont Australia |
|
Energy |
Energy Audit |
Jundee Pajingo Adelaide Perth Golden Grove Energy Audit |
| Jul-07 |
WorleyParsons |
Alinta |
Oil and Gas Extraction |
Risk |
HAZOP |
Jaguar Mine Take-off and Metering Station |
| Apr-04 |
Hatch |
Hatch |
|
Risk |
Technical Risk Assessment |
Inductions Admin overheads |
| Sep-04 |
Hatch |
WAPL |
Metal Product Manufacturing |
Risk |
HAZOP |
Indirect Slurry Heating Pilot Plant |
| Feb-09 |
WorleyParsons |
Epic Energy |
Oil and Gas Extraction |
Risk |
HAZOP |
Horizon Karratha Power Station HAZOP |
| Feb-05 |
AHAC (AIG) |
Rio Tinto |
Metal Product Manufacturing |
Risk |
Insurance Risk Survey |
Hismelt Insurance Risk Survey |
| Sep-07 |
Heron Resources |
Heron Resources |
Metal Ore Mining |
Risk |
HAZOP |
HAZOP of Heap Leach Process |
| Dec-07 |
Fluor |
Oxiana |
Metal Ore Mining |
Risk |
HAZOP |
HAZOP of Aries Borefield |
| Apr-07 |
GRD Minproc |
Dundee Precious Metals |
Metal Ore Mining |
Risk |
HAZID/Process Plant |
HAZID of Hydrometallurgical Plant Upgrade |
| Sep-07 |
Fluor |
Oxiana |
Metal Ore Mining |
Risk |
HAZID/Process Plant |
HAZID of Hydrometallurgical Plant |
| Apr-07 |
GRD Minproc |
Chelopech |
Metal Ore Mining |
Risk |
HAZID/OHS Risk Assmt |
HAZID |
| Jun-08 |
Department of Resources Energy and Tourism |
Department of Resources Energy and Tourism |
Technical Services |
Energy |
Research |
Guide to Energy Efficiency for Mobile Equipment |
| Apr-07 |
WorleyParsons |
FMG |
Rail Transport |
Risk |
HAZID/OHS Risk Assmt |
Guardrail Installation Road Safety Risk Assessment |
| May-06 |
Western Power Corporation |
Western Power Corporation |
Technical Services |
Energy |
Energy Audit |
Greenhouse Inventory Investigations |
| Jun-06 |
Verve Energy/Western Power Corporation |
Verve Energy/Western Power Corporation |
Technical Services |
Energy |
Energy Audit |
Greenhouse Intensity prior to disaggregation |
| Mar-06 |
Alcoa |
Alcoa |
Metal Product Manufacturing |
Energy |
Energy Audit |
Greenhouse Gas Emmisions Reporting Support |
| Jun-05 |
Western Power Corporation |
Western Power Corporation |
Technical Services |
Energy |
Policy Guidance |
Greenhouse Gas Emmisions - Reporting |
| Jun-06 |
BGC Contracting |
BGC Contracting |
Technical Services |
Energy |
Energy Audit |
Greenhouse Gas Emissions Services |
| Jan-08 |
Department of Environment and Heritage |
Hollywood Hospital |
Hospitals and Nursing Homes |
Energy |
Energy Audit |
Greenhouse Challenge Reporting assistance |
| Sep-06 |
Department of Environment and Heritage |
Hollywood Hospital |
Hospitals and Nursing Homes |
Energy |
Energy Audit |
Greenhouse Challenge Reporting assistance |
| Sep-07 |
Department of Environment and Heritage |
Bethesda Hospital |
Hospitals and Nursing Homes |
Energy |
Energy Audit |
Greenhouse Challenge Reporting assistance |
|
Department of Environment and Heritage |
Bethesda Hospital |
Hospitals and Nursing Homes |
Energy |
Energy Audit |
Greenhouse Challenge Reporting assistance |
| Jul-01 |
Greenhouse Challenge |
Bethesda Hospital |
Hospitals and Nursing Homes |
Energy |
Energy Audit |
Greenhouse Challenge Annual Reporting Assistance |
|
Department of Environment and Heritage |
Esplanade Hotel |
Accommodation |
Energy |
Energy Audit |
Greenhouse Challenge Annual Reporting Assistance |
| Nov-07 |
Australian Greenhouse Office |
Department of the Environment and Heritage |
Technical Services |
Energy |
Energy Audit |
Greenhouse Challenge Annual Reporting Assistance |
| May-10 |
WorleyParsons |
BP |
Oil and Gas Extraction |
Risk |
Technical Report |
GBP Compressor Upgrade RAM Study |
| Oct-08 |
CSIRO |
CSIRO |
Oil and Gas Extraction |
Risk |
SIL Review |
Gas To Liquids Pilot Plant |
| Feb-07 |
Total Automation |
Pilbara Iron |
Electricity and Gas Supply |
Risk |
SIL Review |
Gas Delivery Station Overpressure Protection |
| Jul-07 |
MYR Consulting |
MAN TAKRAF |
Services to Transport |
Risk |
Functional Safety |
Further advice regarding Functional Safety |
| Mar-07 |
MYR Consulting |
MAN TAKRAF |
Services to Transport |
Risk |
Functional Safety |
Further advice regarding Functional Safety |
| Mar-07 |
WorleyParsons |
ConocoPhillips |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
FSO Liberdade ROV Inspection of Ballast Tanks |
| Nov-05 |
Edith Cowan University |
Edith Cowan University |
Education |
Energy |
Policy Guidance |
Energy Policy and Procedures Review |
| Jun-03 |
Edith Cowan University |
Edith Cowan University |
Education |
Energy |
Policy Guidance |
Energy Policy and Procedures Formulation |
| Oct-07 |
DITR |
DITR |
Metal Ore Mining |
Energy |
Technical Report |
Energy Mass Balance Case Study for the Mining Industry |
| Oct-01 |
WMC Resources Limited |
BHPB Nickel West |
Metal Ore Mining |
Energy |
Energy Management |
Energy Management Support Services |
| Dec-07 |
University of Western Australia |
University of Western Australia |
Education |
Energy |
Training |
Energy Management Speaker |
| Feb-04 |
Edith Cowan University |
Edith Cowan University |
Education |
Environment |
Policy Guidance |
Energy Management Procedures Development |
| Oct-04 |
City of Melville |
City of Melville |
Government Administration |
Energy |
Energy Audit |
Energy Management Procedure |
| Apr-09 |
University of Western Australia |
University of Western Australia |
Education |
Energy |
Energy Audit |
Energy Billing Discrepancy |
| Apr-07 |
Energy Ombudsman |
Energy Ombudsman |
Technical Services |
Energy |
Energy Audit |
Energy Audit of Premises |
| Mar-07 |
WorleyParsons |
Verve Energy |
Electricity and Gas Supply |
Risk |
HAZID/OHS Risk Assmt |
Electrochlorination Plant Upgrade |
| Feb-07 |
WorleyParsons |
Verve Energy |
Electricity and Gas Supply |
Risk |
HAZOP |
Electrochlorination Plant Upgrade |
|
WorleyParsons |
Worsley |
|
Risk |
HAZOP |
Efficiency & Growth Project |
| Sep-09 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Oct-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Oct-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Sep-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Jun-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| May-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Apr-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Mar-08 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Efficiency & Growth Project |
| Sep-07 |
DITR |
Alcoa |
Metal Ore Mining |
Energy |
Training |
EEO workshop presentation |
| Apr-08 |
Consolidated Minerals Limited |
Consolidated Minerals Limited |
Metal Ore Mining |
Energy |
Energy Audit |
EEO assessment preparation assistance |
|
Horizon Power |
Horizon Power |
Technical Services |
Energy |
Energy Options |
EE Design Review of New Office |
|
WorleyParsons |
|
|
Risk |
|
DPA |
| Oct-06 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
HAZOP |
Digestion RTO ISH Non Condensible Gas Destruction |
| Apr-07 |
BHP Billiton Nickel West Greensupport |
BHP Nickel West |
Metal Ore Mining |
Energy |
Policy Guidance |
Development of Energy Standards |
|
Hatch |
|
|
Risk |
Technical Risk Assessment |
Develop Boiler Safety |
| Sep-07 |
WorleyParsons |
FMG |
Metal Ore Mining |
Risk |
HAZOP |
Detailed Design HAZOP of new facility |
| Jan-07 |
WorleyParsons |
Sunset Coast |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
Detailed Design HAZOP of new facility |
| Dec-06 |
WorleyParsons |
Sunset Coast |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
Detailed Design HAZOP of new facility |
| Feb-08 |
GRD Minproc |
Freeport McMoran |
Metal Ore Mining |
Risk |
HAZOP |
Detailed Design HAZOP (III) of new facility |
| May-07 |
GRD Minproc |
Freeport McMoran |
Metal Ore Mining |
Risk |
HAZOP |
Detailed Design HAZOP (I & II) of new facility |
| Dec-06 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZOP |
Detailed Design HAZOP #3 (Design Changes) |
| Sep-08 |
QMAG |
QMAG |
Metal Ore Mining |
Risk |
Process Safety Management |
Deadburning Process Safety Management Review |
| Dec-09 |
WorleyParsons |
Dampier Bunbury Pipeline |
Oil and Gas Extraction |
Risk |
HAZOP |
DBP Mandurah Gate Station HAZOP |
|
WorleyParsons |
Dampier Bunbury Pipeline |
|
Risk |
HAZID |
DBP Construction HAZID |
| Oct-09 |
WorleyParsons |
Worsley |
|
Risk |
HAZOP |
DBO Pumps HAZOP |
| Jul-06 |
WorleyParsons |
Agility |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
DBNGP-GGP Interconnect - Construction |
| Feb-07 |
WorleyParsons |
Alinta |
Oil and Gas Extraction |
Risk |
HAZOP |
DBNGP Stage 5A Exp - Electrical Scope |
| Nov-06 |
Pilbara Iron |
Pilbara Iron |
Water Transport |
Risk |
QRA |
Dampier Port Channel Upgrade Options - Risk Analysis |
| Oct-08 |
University of Western Australia |
University of Western Australia |
Education |
Energy |
Energy Audit |
Crawley Campus Energy Audit |
| Jun-09 |
MYR Consulting |
Takraf / Patrick Botany |
Water Transport |
Risk |
HAZID/OHS Risk Assmt |
Crane Maintenance OHS Risk Assessment |
| Mar-07 |
WorleyParsons |
Alinta |
Oil and Gas Extraction |
Risk |
HAZOP |
Cosmos Mine Take-off and Metering Station |
| Jul-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Project Risk Assessment |
Concurrent Loading and Cooldown |
| Mar-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Concurrent Loading and Cooldown |
| Jan-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Technical Risk Assessment |
Concurrent Loading and Cooldown |
| Jan-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Design Review |
Concurrent Loading and Cooldown |
| Sep-08 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Project Risk Assessment |
Concurrent Loading & Cooling Project Project Risk Assessment |
| Apr-05 |
Hatch |
Alcoa |
Electricity and Gas Supply |
Risk |
HAZOP |
Cogeneration Unit 2 Tie Ins |
| Dec-05 |
Hatch |
Alinta |
Electricity and Gas Supply |
Risk |
Technical Risk Assessment |
Cogeneration Unit 2 Ministerial Conditions |
| Aug-05 |
Hatch |
Alcoa |
Electricity and Gas Supply |
Risk |
HAZOP |
Cogeneration Unit 2 Condensate |
| Oct-05 |
Hatch |
Alinta |
Electricity and Gas Supply |
Risk |
HAZOP |
Cogeneration Unit 1 Reserve Condensate Storage |
|
WorleyParsons |
Verve Energy |
Electricity and Gas Supply |
Risk |
HAZOP |
Cockburn 1 Power Station HRSG Chemical Clean HAZOP |
| Apr-09 |
Department of Resources Energy and Tourism |
Department of Resources Energy and Tourism |
Technical Services |
Energy |
Technical Report |
Climate Change Action Fund Advice |
| Jul-06 |
WorleyParsons |
Watercorp |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
Chemical Cleaning Modifications HAZOP/Design Review |
| Jun-05 |
MYR Consulting |
Jardine Lloyd Thompson |
Other Manufacturing |
Risk |
Insurance Risk Survey |
Chemeq Insurance Risk Survey |
| May-07 |
GRD Minproc |
Chelopech |
Metal Ore Mining |
Risk |
HAZOP |
Chelopech Mining (Dundee) Metals Production Facility HAZOP |
| Dec-07 |
WorleyParsons |
Worsley |
Metal Product Manufacturing |
Risk |
CHAZOP |
CHAZOP of new plant air compressor system |
| May-10 |
Rio Tinto Iron Ore |
Rio Tinto Iron Ore |
Metal Ore Mining |
Risk |
Quantitative Risk Analysis |
Cape Lambert Channel Upgrade Risk Assessment |
| Oct-06 |
WorleyParsons |
J.P. Kenny |
Oil and Gas Extraction |
Risk |
HAZOP |
Ca Mau Gas Pipeline Project - ReHAZOP |
| Mar-06 |
Midland Brick |
Midland Brick |
Non-Metallic Mineral Product Manufacturing |
Risk |
Business Risk Assessment |
Business Risk Analysis |
| Nov-08 |
AIG Technical Services |
Rio Tinto Risk Management |
Metal Ore Mining |
Risk |
Business Continuity Planning |
Business Continuity Planning Iron Ore |
| Aug-06 |
AHAC (AIG) |
Pilbara Iron |
Metal Ore Mining |
Risk |
Business Continuity Planning |
Business Continuity Plan Preparation |
| Mar-09 |
WorleyParsons |
Westnet Energy |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Bunbury PRS Construction & Commissioning HAZID |
| Mar-07 |
WorleyParsons |
Woodside |
Oil and Gas Extraction |
Risk |
Project Risk Assessment |
Browse Project Risk Assessment |
| Apr-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Bldg 50 Hydrate Conveying |
| Mar-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 50 Hydrate Conveying |
| Oct-04 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 50 Calciner 7 - Combustion Safety |
| May-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 50 Calciner 7 |
| May-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 50 Calciner 6 |
| Nov-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 50 Calciner 3 |
| Apr-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Bldg 48 Liq Burning Kiln |
| Dec-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 48 Liq Burning Kiln |
| May-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Bldg 48 Liq Burning Kiln |
| Apr-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 48 Liq Burning Kiln |
| Mar-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 47 Oxalate Kiln |
| Mar-06 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Bldg 35 Debottlenecking Modifications |
| Oct-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Bldg 110 Boiler 2 Burner Upgrade |
| Jun-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZOP |
Bldg 110 Boiler 2 Burner Upgrade |
| Jun-05 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
HAZID |
Bldg 110 Boiler 2 Burner Upgrade |
| Jan-05 |
MYR Consulting |
Jardine Lloyd Thompson |
Metal Ore Mining |
Risk |
Insurance Risk Survey |
Black Swan Mine & Process Plant |
| Jan-10 |
Fluor SKM Iron Ore Joint Venture |
BHP Billiton Iron Ore |
Metal Ore Mining |
Risk |
CHAZOP |
BHPB Iron Ore CHAZOP Facilitation - RGP5 |
| Nov-07 |
GRD Minproc |
BHPBilliton |
Metal Ore Mining |
Risk |
HAZID/OHS Risk Assmt |
BHP Billiton HAZID |
| May-09 |
GRD Minproc |
Heathgate Resources |
Metal Ore Mining |
Risk |
HAZOP |
Beverley Four Mile Project HAZOP |
| Jul-09 |
GRD Minproc |
Heathgate Resources |
Metal Ore Mining |
Risk |
CHAZOP |
Beverley Four Mile Project CHAZOP |
| Aug-05 |
MYR Consulting |
Banpu |
Coal Mining |
Risk |
Business Risk Assmt |
Banpu Business Risk Review |
| Jul-10 |
WorleyParsons |
Saudi Aramco |
Oil and Gas Extraction |
Risk |
Functional Safety |
Arabiyah Hasbah HIPPS System Phase 1 and 2 Verifications |
| Apr-04 |
Hatch |
Alcoa |
Metal Product Manufacturing |
Risk |
Technical Risk Assessment |
Alcoa Alumina Refinery Building Management System |
| Jun-09 |
Veolia Water |
Worsley |
Water Supply, Sewerage and Drainage Services |
Risk |
HAZOP |
AE&E WAPL Cogen Plant Condensate Treatment Plant HAZOP |
| Jun-06 |
WorleyParsons |
Agility |
Oil and Gas Extraction |
Risk |
HAZID/OHS Risk Assmt |
Additional Compression Commissioning & Ops/Maint |
| Dec-06 |
Hatch |
Minara Resources |
Metal Ore Mining |
Risk |
Technical Report |
Acid/SO2 Plant Conceptual Study |
| Nov-05 |
MYR Consulting |
MAN TAKRAF |
Services to Transport |
Risk |
Technical Risk Assessment |
5x Rail Mounted Gantry Cranes (Automated Container Cranes) |
| Aug-10 |
Calibre Projects Pty Ltd |
Fortescue Minerals Group |
Metal Ore Mining |
Risk |
Business Risk Assessment |
Project Estimate Confidence Level Workshop |